Completed ProjectAntalya

Korkuteli–Elmalı Road Earthworks, Engineering Structures, Bridge and BSK Superstructure Works

187.250.434,21 TL
Project OwnerHighways 13. Regional Directorate
LocationAntalya
  • Tender date: 08.05.2017
  • 4.500.000 m³ excavation
  • 3.700.000 m³ dolgu
  • 800.000 m² asfalt
  • 2 units 35 m span bridge
  • 70 units underpasses and culverts
Completed ProjectAntalya

Elmalı–Finike Road Km 0+000–49+000 Section Construction

97.273.252,63 TL
Project OwnerHighways 13. Regional Directorate
LocationAntalya
  • Tender date: 29.06.2016
  • 3.000.000 m³ excavation
  • 1.200.000 m³ dolgu
  • 230.000 m³ loose rock fill
  • 530.000 ton PMAT/PMT
  • Underpass and culvert works
Completed ProjectAnkara

Gölbaşı–Kulu Jct. Bala State Road KM 41+500–86+676 BSK Works

176.531.500,87 TL
Project OwnerHighways 4. Regional Directorate
LocationAnkara
  • 1.500.000 m³ excavation
  • 310.000 m³ dolgu
  • 40.000 m³ loose rock fill
  • 30.000 m³ stone wall
  • 220.000 ton PMT/PMAT
  • 170.000 m² asfalt
Completed
Gölbaşı–Kulu Ayr. Bala Devlet Yolu KM 41+500–86+676 BSK İşi
Gölbaşı–Kulu Ayr. Bala Devlet Yolu KM 41+500–86+676 BSK İşiGölbaşı–Kulu Ayr. Bala Devlet Yolu KM 41+500–86+676 BSK İşiGölbaşı–Kulu Ayr. Bala Devlet Yolu KM 41+500–86+676 BSK İşi
Completed ProjectAnkara

Balışeyh–Sulakyurt Provincial Road Superstructure Construction Work

70.860.824,98 TL
Project OwnerHighways 4. Regional Directorate
LocationAnkara
  • Tender date: 20.05.2020
  • 750.000 m³ excavation
  • 950.000 m³ dolgu
  • 195.000 ton PMT/PMAT
  • 30.000 m² sathi kaplama
  • 35 units underpasses and culverts
Completed
Balışeyh–Sulakyurt İl Yolu Barajlar ve Sulama Yapım İşi
Balışeyh–Sulakyurt İl Yolu Barajlar ve Sulama Yapım İşiBalışeyh–Sulakyurt İl Yolu Barajlar ve Sulama Yapım İşiBalışeyh–Sulakyurt İl Yolu Barajlar ve Sulama Yapım İşi
Completed ProjectAnkara

Gölbaşı Kulu Jct. Çalış Haymana Road Construction Work

Completed
Project OwnerHighways 4. Regional Directorate
LocationAnkara
  • Km 0+000–21+566 and Km 0+000–8+500 section
  • Earthworks tesviye
  • Engineering structures
  • Superstructure works
Completed
Gölbaşı Kulu Ayr. Çalış Haymana Yolu Yapım İşi
Gölbaşı Kulu Ayr. Çalış Haymana Yolu Yapım İşiGölbaşı Kulu Ayr. Çalış Haymana Yolu Yapım İşiGölbaşı Kulu Ayr. Çalış Haymana Yolu Yapım İşi
Completed ProjectAntalya

Finike–Kumluca State Road Coastal Erosion Prevention Works

Completed
Project OwnerHighways 13. Regional Directorate
LocationAntalya
  • Sidewalk construction
  • Foundation excavation
  • Hendek betonu
  • Coastal protection works
  • Kronman perde betonu
Completed
Finike–Kumluca Devlet Yolu Coastal Erosion Prevention Works
Finike–Kumluca Devlet Yolu Coastal Erosion Prevention WorksFinike–Kumluca Devlet Yolu Coastal Erosion Prevention WorksFinike–Kumluca Devlet Yolu Coastal Erosion Prevention Works
Completed ProjectMersin

Mersin Anamur Alaköprü Settlement Area Phase 2

70.860.824,98 TL
Project OwnerMersin Provincial Directorate of Environment, Urbanization and Climate Change
LocationMersin
  • 325 units agricultural land target
  • 1.100.000 m² agricultural land
  • 14.000.000 m³ excavation
  • 1.500.000 m³ dolgu
  • 25.000 m fore excavationk
  • 20 km irrigation line
Completed
Mersin Anamur Alaköprü Settlement Area Phase 2
Mersin Anamur Alaköprü Settlement Area Phase 2Mersin Anamur Alaköprü Settlement Area Phase 2Mersin Anamur Alaköprü Settlement Area Phase 2
Completed ProjectMersin

Construction of Concrete Safety Barriers on Various Roads

Completed
Project OwnerHighways 5. Regional Directorate
LocationMersin
  • Highways 5. Regional Directorate dahilinde
  • Muhtelif yollarda beton otokorkuluk
  • Road safety applications
Completed
Construction of Concrete Safety Barriers on Various Roads
Construction of Concrete Safety Barriers on Various RoadsConstruction of Concrete Safety Barriers on Various RoadsConstruction of Concrete Safety Barriers on Various Roads
Completed ProjectAnkara

Mogan Flood Control Dam

Completed
Project OwnerGeneral Directorate of State Hydraulic Works
LocationAnkara
  • Dam body height: 10 m
  • Dam body fill volume: 365.000 m³
  • Maksimum su seviyesi: 991 kotu
  • Maksimum hacim: 26 hm³
  • Minimum hacim: 1,9 hm³
Completed
Mogan Flood Control Dam (Barajı)
Mogan Flood Control Dam (Barajı)Mogan Flood Control Dam (Barajı)Mogan Flood Control Dam (Barajı)
Completed ProjectErzurum

Başköy Dam Construction

Completed
Project OwnerGeneral Directorate of State Hydraulic Works
LocationErzurum
  • Earth-fill dam body type
  • Dam body volume: 2.850.000 m³
  • Height from riverbed: 101 m
  • Reservoir volume: 165,51 hm³
  • Reservoir area: 4,90 km²
  • 25.747 hektar sulama hizmeti
Completed
Başköy Barajı İnşaatı
Başköy Barajı İnşaatıBaşköy Barajı İnşaatıBaşköy Barajı İnşaatı